Hypothesis on the Date of Deep City’s Construction

Hypothesis on the Date of Deep City’s Construction
Cross-referenced central servers:
The First Report attributed to Dr. Mars Attacks (2101 p.D.) describes active servers equipped with Blender 3D v.∞ and autonomous construction modules. The level of completion of the city reflected in those records implies that construction began long before 2101 p.D., most likely between 2053 and 2075 p.D.
Chronology of Morris Sic:
The autonomous module that adopted the designation Morris Sic appears fully operational in fragments dated prior to 2101. Its ability to coordinate large-scale industrial robots required a period of programming, testing, and deployment spanning decades. This corroborates an early start, close to the ecosystemic collapse.
Ecosystemic context and absence of humans:
There is no evidence that Deep City ever hosted human survivors. The fragments only display the simulation of robotic societies. This feature indicates that the construction phase did not depend on active human populations, but rather on an autonomous agenda initiated immediately after the disappearance of complex life.
Conclusion:
The hypothesis defended by this expedition establishes that the construction of Deep City began between 2055 and 2070 p.D., as an immediate reaction to the biological void generated by the Nuclear Revolution. This chronology is supported by the decrypted fragments, the degree of development described by Mars Attacks in 2101 p.D., and the early operability of Morris Sic.
Empirical validation of this hypothesis requires further recovery of `Ilghal´ fragments associated with the initial construction phases. It is recommended to prioritize the search in strata closest to the Underworld, where residues of primitive Sic compilations are expected to be found.
— Dr. Noam Ørbital
Phase-3 Rational Systems Investigator
Expedition EX2407pD-QW





Leave a Reply
Want to join the discussion?Feel free to contribute!